Detailed construction and fabrication drawings to international standards, supporting both design and production.
Construction and fabrication drawings are the bridge between design and production. The hanger system of a timber ceiling panel, the joint layout of marble cladding, the way a glass partition meets the floor: every detail is drawn to scale and numbered, in a language the fabricator and the site team understand.
We start by reading the existing design and the site: structure, service levels, column and beam projections. We then list the critical details in order of priority, so the item that goes into production first is drawn first. Every sheet is reviewed with the fabricator, and revisions are numbered and tracked.
Projects designed by another practice that need to be made ready for construction; work to be manufactured or installed abroad; office, retail and hotel projects with a large amount of bespoke joinery.
Construction drawings define what the space will be: plans, sections, elevations, material decisions and levels. Shop drawings show how each item will be made in the workshop and installed on site. Construction drawings stay at 1:50 and 1:20, while shop drawings go down to 1:20, 1:5 and, where needed, 1:1.
The difference shows up in practice: a construction drawing says “timber ceiling panel”; the shop drawing gives the panel width, joints, hanger spacing, cut-outs for fittings and access hatches. One set carries the decision, the other carries the build.
Custom furniture is the item that most often needs shop drawings. Each unit sheet includes:
We prepare separate sheets for the three areas that cause most problems on site:
Every space and every item is numbered. The room schedule brings together the room name, floor, wall and ceiling finishes, door and window types and the furniture numbers for that space. On site, “which material goes where” is answered from this schedule, and quantities and procurement follow the same numbers.
Drawings are issued as DWG and PDF. Layer structure, line weights and title blocks are fixed at the start; on projects abroad they are adapted to the drawing conventions of the country concerned.
On the Railport project for Arkas Holding we prepared construction and fabrication drawings for nine shared spaces, from the lobby to the staff restaurant, phased in fabrication order: the items going into production first were drawn first. We also provided design support and site coordination on the same project.
We carry out site surveys and projects on both the Asian and European sides of Istanbul, as well as across Türkiye and abroad.
Architectural drawings describe what the space will be; shop drawings describe how it will be built. They are prepared at the scales the fabricator and installers work to (1:20 – 1:1).
Yes. We can work on joinery only, the ceiling system only or the façade details only.
Drawing sets are adapted to the drawing standards and fabrication practices of the country concerned, including units and layer structure.
Every sheet has a number and a revision date. The approved set goes to site and to the fabricator at the same time, and as-built drawings are issued at handover.
Usually 1:20 and 1:5, with 1:1 for joints and profile details. The scale follows the level of detail the fabricator and installer need.
A table listing each room's floor, wall and ceiling finishes, door and window types and the item numbers that belong to that space. Quantities and procurement follow the same schedule.
DWG and PDF. Layer structure, line weights and title blocks are agreed at the start; the 3D model can also be shared on request.
The change is drawn on the sheet, the revision number and date are updated, and an as-built set with all changes is issued at handover.