Skip to content
Endüstriyel tesiste epoksi zemin kaplama uygulayan ekip
Service · Istanbul, Türkiye and abroad

Epoxy Floor Coating

Durable, easy-to-clean, seamless epoxy flooring for factories, warehouses, car parks and commercial spaces. One team from floor preparation to top coat.

GET A QUOTE

Epoxy coating creates a seamless, hygienic surface that stands up to heavy traffic, chemicals and frequent cleaning. What really decides the result, though, is floor preparation: a coating laid without moisture testing, grinding and repairs soon blisters and lifts. That is why every job starts with measuring the floor.

Scope

  • Floor survey and moisture testing
  • Surface preparation by diamond grinding or shot blasting
  • Crack and joint repairs
  • Epoxy primer and self-levelling or roller-applied coating
  • Antistatic, anti-slip and food-safe systems
  • Walkway, lane and parking bay marking
  • UV-resistant polyurethane top coat

Where is it used?

Factories and production areas, warehouses and logistics centres, car parks, laboratories, food and pharmaceutical facilities, showrooms and shops, commercial kitchens.

Process

  1. Survey and moisture test: the condition, strength and moisture of the floor are measured on site.
  2. Surface preparation: old coatings and weak layers are removed by grinding or shot blasting.
  3. Repairs: cracks, joints and damaged areas are filled.
  4. Primer: an epoxy primer is applied so the coating bonds to the floor.
  5. Main coat: a self-levelling or roller-applied coat at the required thickness.
  6. Top coat and curing: line marking and a polyurethane top coat where needed, followed by the curing period.

What affects the price?

  • Floor area
  • The condition of the existing floor
  • Coating system and thickness
  • Special requirements such as antistatic or anti-slip finishes
  • Whether the work must be phased while the facility is running

After the site survey and floor tests we price every item separately and give you a quote with no surprises.

We carry out site surveys and projects on both the Asian and European sides of Istanbul, as well as across Türkiye and abroad.

Production area with epoxy floor
Production area with epoxy floor
Epoxy floor coating application
Epoxy floor coating application

Frequently asked questions

When can an epoxy floor be used?

Usually after 24 hours for foot traffic and after about 7 days for full load. Times depend on the ambient temperature.

Can you work while the facility is running?

Yes. The area is divided into phases so that production or warehouse operations can continue.

Can epoxy be applied over tiles or old concrete?

With the right preparation, yes. The method is decided after the floor survey.

How long does an epoxy floor last?

On a properly prepared floor it lasts for many years. Heavy-traffic areas get a thicker system and a protective top coat.